Patch 1.0.5
A small patch to address a couple of critical issues that have been found.
Critical Fix
-
Fixed problems with foundations connecting/disconnecting to joints
-
Fixed first tutorial soft lock (trying to draw with wood instead of road)
Levels
-
Fixed anchor that started as a split anchor in TT-09 (Fetch Quest)
-
Fixed floating decor in TT-12 (Transfer of Power)
-
Fixed decor rock missing in Build Mode in SC-02 (Double Back)
UI
- Added Twitch CTA (Call To Action) on Main Menu if streaming
Other
-
Cap stress at 99.99% if no breaks
-
Load profile and progress backup files if load fails
Thank you again to the Poly Bridge 3 community for your support!
Комментарии 0
Гостевые никнеймы не подтверждают личность. Все комментарии проходят проверку владельцем сайта.
Обсуждение ещё не началось.